The Ultimate Showdown: Cost Plus Contract vs GMP
When it comes to construction contracts, there are a few different options to choose from. Two of the most popular choices are cost plus contracts and guaranteed maximum price (GMP) contracts. Each has its own set of advantages and disadvantages, and it`s important to understand the differences between the two before making a decision. Let`s take a closer look at each type of contract and how they compare.
Cost Plus Contract
A cost plus contract, also known as a cost-reimbursable contract, is exactly what it sounds like. Owner agrees pay contractor actual costs project, plus fee. This fee is typically a percentage of the total cost and is meant to cover the contractor`s overhead and profit. Advantage cost plus contract provides flexibility changes unforeseen during construction process. However, this flexibility also comes with the risk of cost overruns and the potential for disputes over what constitutes a legitimate cost.
GMP Contract
A GMP contract, on the other hand, sets a maximum price for the project. The contractor agrees to complete the project for this maximum price, and any cost overruns are the responsibility of the contractor. This type of contract provides more certainty for the owner in terms of cost, but it also requires a more thorough and accurate initial cost estimation. This can be challenging, as it requires the contractor to anticipate and account for all potential costs and risks upfront.
Comparison
So, which type of contract is the better choice? The answer depends on the specific circumstances of the project. Here`s comparison two types contracts:
Factor | Cost Plus Contract | GMP Contract |
---|---|---|
Cost Certainty | Low | High |
Flexibility Changes | High | Low |
Risk Cost Overruns | High | Low |
Risk Allocation | Owner | Contractor |
Case Studies
Let`s take a look at a couple of real-world examples to illustrate the differences between cost plus contracts and GMP contracts:
Case Study 1: Bridge Construction
In a cost plus contract for the construction of a bridge, the contractor encounters unexpected soil conditions that require additional work and materials. Terms contract, owner responsible additional costs. Project ends exceeding initial budget, leading dispute owner contractor.
Case Study 2: Office Building Project
In a GMP contract for the construction of an office building, the contractor underestimates the cost of steel due to fluctuations in market prices. As a result, the contractor has to absorb the additional costs, but the project is completed within the agreed-upon maximum price.
Both cost plus contracts and GMP contracts have their pros and cons. It`s important for owners and contractors to carefully consider the specific needs and risks of a project before choosing the most appropriate contract type. Ultimately, open communication and a clear understanding of the terms and conditions are essential for the success of any construction project.
Cost Plus Contract vs GMP: 10 Legal Questions Answered
Question | Answer |
---|---|
1. What is a cost plus contract? | A cost plus contract, also known as a cost-reimbursement contract, is a type of contract in which the contractor is paid for all of its allowed expenses, plus additional payment for profit. It is commonly used in construction projects where the final costs are uncertain. |
2. What GMP contract? | GMP stands for Guaranteed Maximum Price. A GMP contract is a type of construction contract where the contractor is paid the actual cost of the work plus a fixed fee. The total price is guaranteed not to exceed a specific amount, providing financial protection for the owner. |
3. What are the key differences between a cost plus contract and a GMP contract? | The main difference lies in the financial risk. In a cost plus contract, the owner bears the risk of cost overruns, while in a GMP contract, the contractor assumes that risk. Additionally, in a cost plus contract, the exact final cost is unknown at the outset, whereas in a GMP contract, it is fixed. |
4. Which type of contract provides better cost control? | A GMP contract provides better cost control as the owner`s financial exposure is limited to the guaranteed maximum price. The contractor is incentivized to control costs, as any savings realized will increase their profit margin. |
5. What are the advantages of a cost plus contract? | A cost plus contract offers flexibility and transparency. It allows for changes to the scope of work and provides visibility into the actual costs incurred. This can be beneficial in situations where the project requirements are not fully defined upfront. |
6. What is a GMP contract? | One potential drawback of a GMP contract is the need for the owner to thoroughly define the scope of work and potential changes upfront. Any omissions or changes to the scope can impact the final cost and may lead to disputes. |
7. Which type of contract is more common in the construction industry? | Both types of contracts are commonly used in the construction industry, with their suitability depending on the specific project requirements and risk allocation preferences of the parties involved. |
8. How are change orders handled in cost plus and GMP contracts? | In a cost plus contract, change orders can lead to higher overall project costs, as the owner is responsible for reimbursing the contractor`s additional expenses. In a GMP contract, change orders must be carefully managed to ensure they do not exceed the guaranteed maximum price. |
9. Can a cost plus contract be converted to a GMP contract? | Yes, it is possible to convert a cost plus contract to a GMP contract through negotiation and agreement between the parties involved. This can provide the owner with greater cost certainty while potentially offering the contractor a more substantial profit margin. |
10. What legal considerations should be taken into account when choosing between a cost plus and GMP contract? | When deciding between the two contract types, careful consideration should be given to risk allocation, cost control, scope definition, and potential changes to the project. It is advisable to seek legal counsel to ensure the chosen contract aligns with the specific needs and objectives of the parties involved. |
Understanding the Differences: Cost Plus Contract vs GMP
When entering into a construction contract, it is important to understand the differences between a cost plus contract and a guaranteed maximum price (GMP) contract. Both types of contracts have their own advantages and disadvantages, and it is crucial for all parties involved to be aware of their rights and obligations. The following legal contract provides a comprehensive overview of the key differences and provisions for each type of contract.
Cost Plus Contract | GMP Contract |
---|---|
A cost plus contract, also known as a cost-reimbursable contract, allows the owner to reimburse the contractor for all of the construction expenses, including materials, labor, and overhead costs. The contractor is typically paid a fee on top of the actual costs incurred, which is negotiated and agreed upon in the initial contract. Advantages: Flexibility in project scope changes, transparency in cost breakdown, fair compensation for contractor`s efforts. |
A guaranteed maximum price (GMP) contract sets a limit on the total price that the owner will pay for the construction project. If the actual costs exceed the agreed-upon maximum price, the contractor is responsible for covering the additional expenses. The contractor may also receive incentives for completing the project under the GMP. Advantages: Cost certainty for the owner, potential cost savings for the owner if the project is completed under budget, shared risk between owner and contractor. |
In consideration of the foregoing, the parties hereto agree to the following terms and conditions:
1. Definitions
For the purposes of this contract, the following definitions shall apply:
- Cost Plus Contract: [Insert legal definition here]
- GMP Contract: [Insert legal definition here]
2. Scope Work
The scope of work for the construction project shall be as outlined in Exhibit A, attached hereto and incorporated herein by reference.
3. Payment Terms
Payment under the cost plus contract shall be made in accordance with the actual costs incurred by the contractor, plus the negotiated fee. Payment under the GMP contract shall be subject to the maximum price agreed upon by the parties.
4. Change Orders
Any changes to the scope of work or project specifications shall be addressed through change orders, with the applicable pricing adjustments based on the type of contract in place.
5. Governing Law
This contract shall be governed by the laws of [insert state/country], without regard to its conflict of laws principles.
6. Dispute Resolution
Any disputes arising out of this contract shall be resolved through arbitration in accordance with the rules of the American Arbitration Association.